Lărgire La 4 Benzi A Centurii Rutiere A Municipiului București Sud Între A1 (Km 55+520) Si DN 5 (Km 40+000) – Lot I Lărgire La 4 Benzi A Centurii Rutiere A Municipiului București Sud Între A1 (Km 55+520) Și Km 54+700 Inclusiv Parcarea De Lungă Durată De La


Project Details

  • Completion date June 2023
  • Location Bucuresti, Romania
  • Sector Infrastructure
  • Area 17,000 sqm

Project Description

The road structure on the Bucharest Beltway sector between A1 (km 55+520) and km 54+700 will be reinforced as follows: 28cm recycling and stabilization; – 8cm AB31.5 geocomposite base course; – 6cm BAD binder course; 5cm MAS wearing course. The car park at km 54+765 will have access from the roundabout on the Bucharest Beltway via a link road to ensure access from all directions. The road structure of the link road will be the same as that of the CB.

Together, we can build anything

Ideas have no limit, they just need a good plan and a team of professionals

Contact us!